Coverage
39 states, one standard of care.
Every engineer letter we issue is signed and sealed by a professional engineer licensed in the state where the property sits. Here's where our active network operates today.
Priority metros
Same-day site visits
In these metros we fly in, document the property, and issue the sealed letter without waiting on a local subcontractor's calendar. Each page covers the adopted code edition and how that jurisdiction handles after-the-fact certification.
-
Georgia
Atlanta
2024 International Residential Code with 2026 Georgia State Amendments
Engineer letters in Atlanta → -
North Carolina
Charlotte
2018 North Carolina State Building Code (Residential)
Engineer letters in Charlotte → -
North Carolina
Raleigh–Durham
2018 North Carolina State Building Code (Residential)
Engineer letters in Raleigh–Durham → -
Tennessee
Nashville
Nashville: 2024 I-Codes · Tennessee statewide baseline: 2018 IRC
Engineer letters in Nashville → -
Tennessee
Knoxville
2018 International Residential Code (Tennessee statewide baseline)
Engineer letters in Knoxville → -
Texas
Dallas–Fort Worth
2021 International Residential Code with local amendments
Engineer letters in Dallas–Fort Worth → -
Texas
Austin
Austin Residential Code 2021 (2021 IRC with Austin amendments)
Engineer letters in Austin →
Full licensure
All 39 states
- Alabama
- Arizona
- Arkansas
- Colorado
- Connecticut
- Florida
- Georgia
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Mississippi
- Missouri
- Montana
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- Ohio
- Oregon
- South Carolina
- Tennessee
- Texas
- U.S. Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
Don't see your state?
We almost certainly still have you covered.
Beyond our primary network above, we maintain an extended bench of licensed professional engineers across the remaining states. If your project is in a state not listed here, please reach out — we can almost always place it with a credentialed PE in our network. Turnaround may take slightly longer than our standard 24–48 hour window while we route the file to the right engineer.
Ready to start?
Get a sealed letter in 24–48 hours.
Tell us about your project. Our team at Oasis Engineering will confirm scope, fee, and turnaround within hours.