Durham, NC · 2023 · PE sealed
Construction verification letter
Construction verification letter — drainage analysis and stormwater management design for new residential construction on a 0.072-acre lot in Durham, NC (per NRCS TR-55).
- construction verification
- in-progress inspection
- engineer letter Durham, NC
- construction verification Durham
- PE letter NC