Liberty Lake, WA · 2023 · PE sealed
Construction verification letter
Construction verification letter — approves substitution of 15/32-inch OSB sheathing for 3/4-inch plywood sheathing on exterior walls of studio construction project.
- construction verification
- in-progress inspection
- engineer letter Liberty Lake, WA
- construction verification Liberty Lake
- PE letter WA