Port Charlotte, FL · 2025 · PE sealed
Permit closure affidavit
Permit closure affidavit — certification that roof dry-in and final inspections meet permit requirements for a roof constructed in 2020 (per FBC 2020 7th Edition, Florida Statutes 553.791, Florida Statutes 553.844).
- permit closure
- engineering affidavit
- expired permit
- engineer letter Port Charlotte, FL
- permit closure Port Charlotte
- PE letter FL
Port Charlotte, FL · 2025 · PE sealed
Engineering letter
Engineering letter — visual assessment of fiberglass light poles to determine interim stability in bare-pole condition after fixture removal (per AASHTO LTS-6, ASCE 7-16, ANSI C136.20).
- engineer letter
- engineer letter Port Charlotte, FL
- engineer letter Port Charlotte
- PE letter FL
Port Charlotte, FL · 2025 · PE sealed
Engineering letter
Engineering letter — visual assessment of approximately 240 fiberglass light poles in bare-pole condition to determine interim stability pending retrofit and repairs (per ASCE 7-16, AASHTO LTS-6, ANSI C136.20).
- engineer letter
- engineer letter Port Charlotte, FL
- engineer letter Port Charlotte
- PE letter FL
Port Charlotte, FL · 2025 · PE sealed
Engineering letter
Engineering letter — visual inspection and wind-load analysis to determine whether fiberglass light poles may remain temporarily in service after removal of fixtures and solar panels (per AASHTO LTS-6, ASCE 7-16, ANSI C136.20).
- engineer letter
- engineer letter Port Charlotte, FL
- engineer letter Port Charlotte
- PE letter FL
Port Charlotte, FL · 2025 · PE sealed
Engineering letter
Engineering letter — visual inspection and wind-load analysis of 99 fiberglass light poles to determine interim stability in bare-pole condition after fixture removal (per ASCE 7-16, AASHTO LTS-6, ANSI C136.20).
- engineer letter
- engineer letter Port Charlotte, FL
- engineer letter Port Charlotte
- PE letter FL
Port Charlotte, FL · 2025 · PE sealed
Structural modification letter
Structural modification letter — structural stability assessment of solar panel and lighting retrofit on existing fiberglass poles with stabilization collar installation (per FBC 2023, ASCE 7-22).
- structural modification
- wall removal
- beam addition
- engineer letter Port Charlotte, FL
- structural modification Port Charlotte
- PE letter FL
Port Charlotte, FL · 2024 · PE sealed
Missed inspection affidavit
Missed inspection affidavit — certifies that residential addition footing work meets Florida Building Code requirements after it was covered before inspection (per Florida Building Code Section 110).
- missed inspection
- engineer affidavit
- rough-in inspection
- engineer letter Port Charlotte, FL
- missed inspection Port Charlotte
- PE letter FL