Projects
Selected work.
Every project below was sealed by a licensed PE and accepted by the local authority having jurisdiction. Names and addresses are redacted for client privacy.
- multi state
Truss Fire Damage — Repair Certification Case Study
A case study on certifying repairs to fire-damaged wood trusses: char depth assessment, residual capacity analysis, and the sealed engineer letter that closed the permit.
- florida
Florida Window Installation — Impact Glazing Permit Closeout Case Study
A Florida case study: certifying impact-rated window installations to Florida Building Code wind-borne debris requirements and closing the open window permit.
- north carolina
Staircase Engineering in North Carolina — Comprehensive Inspection and Appendix G
A North Carolina case study: stair geometry verification, guard and handrail compliance under the NC Residential Code, and the Appendix G documentation we delivered.
Ready to start?
Get a sealed letter in 24–48 hours.
Tell us about your project. Our team at Oasis Engineering will confirm scope, fee, and turnaround within hours.