Issaquah, WA · 2024 · PE sealed
Construction verification letter
Construction verification letter — engineering consultation and revised plans to address noncompliant structural work and field issues for permit completion (per IRC 2018).
- construction verification
- in-progress inspection
- engineer letter Issaquah, WA
- construction verification Issaquah
- PE letter WA
Pomeroy, WA · 2024 · PE sealed
Manufactured home foundation letter
Manufactured home foundation letter — certification that the foundation meets HUD-7584 requirements for a permanent manufactured-home installation (per HUD-4930.3, HUD-7584, WA State Building Code).
- manufactured home foundation
- HUD 7584
- HUD-4930.3
- mortgage compliance
- engineer letter Pomeroy, WA
- manufactured home foundation Pomeroy
- PE letter WA
Liberty Lake, WA · 2023 · PE sealed
Construction verification letter
Construction verification letter — approves substitution of 15/32-inch OSB sheathing for 3/4-inch plywood sheathing on exterior walls of studio construction project.
- construction verification
- in-progress inspection
- engineer letter Liberty Lake, WA
- construction verification Liberty Lake
- PE letter WA
Redmond, WA · 2023 · PE sealed
Construction verification letter
Construction verification letter — verification that the sunroom ledger profile bolt spacing meets design specifications and code requirements.
- construction verification
- in-progress inspection
- engineer letter Redmond, WA
- construction verification Redmond
- PE letter WA
Redmond, WA · 2023 · PE sealed
Construction verification letter
Construction verification letter — verification of bolts and connection spacing for a sunroom addition during construction phase.
- construction verification
- in-progress inspection
- engineer letter Redmond, WA
- construction verification Redmond
- PE letter WA
Redmond, WA · 2023 · PE sealed
Construction verification letter
Construction verification letter — engineering consultation during construction of a sunroom addition addressing field conditions and installation questions.
- construction verification
- in-progress inspection
- engineer letter Redmond, WA
- construction verification Redmond
- PE letter WA
Redmond, WA · 2023 · PE sealed
Structural modification letter
Structural modification letter — engineering consultation for sunroom addition framing, specifically clarifying LVL beam installation around existing truss members.
- structural modification
- wall removal
- beam addition
- engineer letter Redmond, WA
- structural modification Redmond
- PE letter WA